WARRP Home Next Page Previous Page PDF Download
Text Box: Overview
The Bio-response            Operational  Testing and Evaluation (BOTE) Project is an interagency program designed to conduct and evaluate field-level facility biological remediation studies of various  decontamination technologies and to exercise biological incident response from health/law               enforcement response through environmental response (remediation).  This project is   directed toward the intentional release of a biological compound, such as Bacillus anthracis, and will be using a surrogate organism originally named Bacillus   atrophaeus subspecies globigii.  The project is divided into Text Box: two phases:

Phase I: Three levels of 
decontamination methods, showing effectiveness against Bacillus anthracis spores in laboratory and/or field use tested under field-relevant     conditions.
Decontamination      Methods:

Amended Bleach –off-the-shelf         technology (a mixture of household bleach and vinegar)
Chlorine Dioxide (ClO2) –less        availability, requires lead-time planning Text Box: and handling expertise	
Vaporized Hydrogen Peroxide (H2O2) –requires significant   lead-time planning and handling expertise

 Phase II: Interagency     response to a covert B.    anthracis spore release in a facility will be 
conducted.  Activities include    response from law            enforcement, public health response, decontamination and facility release.
The goal of the BOTE    project is to address site        remediation after the        intentional release of Bacillus spores within a facility in an      operational setting, drawing upon the advances in both the general sampling and  decontamination areas over the past several years.

Objectives/Deliverables
The objective is to           Text Box: Bio-Response Operational Testing & Evaluation (BOTE) Program Overview 
Description: Drawing1

certain that your friendly, neighborhood WARRP Transition Manager knows of the transition. We need to be able to track and report on all products in transition. The transition team does not want to slow  anyone down we are definitely depending on everyone’s help, but  we do need to know how you are mapping into the   transition process. We need to know the life span for your transition to enable   accurate tracking and reporting.

 

The challenge is “transition, transition,   transition!!” There still is opportunity for you to receive “the first official WARRP     

Transition!
     Transition!
          Transition!

Transition” award!!

 

-Doug Hardy, WARRP Transition Manager